{"id":15809,"date":"2026-10-07T12:38:11","date_gmt":"2026-10-07T11:38:11","guid":{"rendered":"https:\/\/ventsystems.de\/rwa-wartung-pruefpflichten\/"},"modified":"2026-11-21T09:05:14","modified_gmt":"2026-11-21T08:05:14","slug":"shev-maintenance-inspection","status":"publish","type":"post","link":"https:\/\/ventsystems.de\/en\/rwa-wartung-pruefpflichten\/","title":{"rendered":"SHEV maintenance: inspection duties, intervals and what to consider for window actuators"},"content":{"rendered":"<p class=\"vs-kurzantwort wp-block-paragraph\"><strong>In short:<\/strong> Smoke vent systems must be serviced by a specialist company at least once a year; the results belong in the log book. For special buildings, many German states also require recurring inspection by certified inspectors. The building operator is responsible.<\/p>\n\n\n<p>A smoke and heat exhaust ventilation system (SHEV) must work immediately in the event of fire \u2013 even if it has only been used for ventilation or not moved at all for years. That is why standards and state law require regular maintenance and inspection. This guide shows what operators, facility managers and contractors need to know: which obligations apply, at what intervals inspections take place and what to consider when maintaining window actuators.<\/p>\n\n<h2>Maintenance and expert inspection: two different obligations<\/h2>\n<p>Two things are often confused with SHEV systems:<\/p>\n<ul>\n<li><strong>Maintenance and inspection:<\/strong> regular function testing, servicing and repair by a qualified specialist company \u2013 usually once a year.<\/li>\n<li><strong>Expert inspection:<\/strong> inspection by an officially recognised <a href=\"\/en\/dictionary\/certified-inspector\/\">inspection expert<\/a> under the inspection ordinance of the respective German federal state \u2013 for certain buildings before first commissioning, after significant changes and on a recurring basis.<\/li>\n<\/ul>\n<p>The expert inspection does not replace annual maintenance. Both obligations apply side by side.<\/p>\n\n<h3>Obligations at a glance<\/h3>\n<table><thead><tr><th>Obligation<\/th><th>Who<\/th><th>Interval<\/th><th>Source<\/th><\/tr><\/thead><tbody><tr><td>Visual inspection<\/td><td>Operator<\/td><td>monthly (recommendation)<\/td><td><a href=\"https:\/\/www.bhe.de\/_Resources\/Persistent\/0\/1\/3\/3\/01334e9903d01c371940ccdfc72300ea6e5b6352\/2021_07_Pflicht%20zur%20regelm%C3%A4%C3%9Figen%20Wartung.pdf\" target=\"_blank\" rel=\"noopener\">BHE information sheet SHEV (07\/2021)<\/a><\/td><\/tr><tr><td>Maintenance and inspection<\/td><td>qualified specialist company<\/td><td>as specified by the manufacturer, usually once a year<\/td><td>DIN 18232-2, section 10.2; VdS\/CEA 4020<\/td><\/tr><tr><td>Inspection by a certified expert<\/td><td>officially recognised inspection expert<\/td><td>before first commissioning, after significant changes, and recurring within three years<\/td><td><a href=\"https:\/\/umwelt-online.de\/recht\/bau\/argebau\/mpruefv.htm\" target=\"_blank\" rel=\"noopener\">German Model Inspection Ordinance (MPr\u00fcfVO), \u00a7 2<\/a><\/td><\/tr><\/tbody><\/table>\n<p><em>The expert inspection only applies to certain buildings, e.g. retail and assembly buildings, high-rise buildings and schools. The inspection ordinance of the respective German federal state is decisive. For information only, not legal advice.<\/em><\/p>\n<p>All maintenance, inspections and repairs are documented in the system\u2019s <a href=\"\/en\/dictionary\/shev-logbook\/\">logbook<\/a> .<\/p>\n\n<h2>How often must a SHEV system be maintained?<\/h2>\n<p>For natural smoke and heat exhaust ventilators, DIN 18232-2 stipulates that they must be inspected and maintained according to the manufacturer's instructions, usually once a year. VdS guidelines also require inspections at regular intervals, at least annually. If the manufacturer specifies shorter intervals, these apply.<\/p>\n<p>Maintenance may only be carried out by a specialist company qualified for the system concerned. All work is documented in the system logbook.<\/p>\n\n<h2>When is an inspection expert required?<\/h2>\n<p>The inspection ordinances of the German federal states require smoke extraction systems in special buildings to be inspected by recognised experts. Typical examples are:<\/p>\n<ul>\n<li>Retail and exhibition spaces over 2,000 m\u00b2<\/li>\n<li>Assembly venues, schools and hospitals<\/li>\n<li>High-rise buildings and hotels<\/li>\n<li>Medium and large car parks as well as large industrial and warehouse buildings<\/li>\n<\/ul>\n<p>Inspections take place before commissioning, after significant changes and at recurring intervals \u2013 every three years in most federal states, at longer intervals in some. Which rule applies to your building is stated in the building permit or fire protection concept and in the inspection ordinance of your federal state.<\/p>\n\n<h2>What is checked during maintenance?<\/h2>\n<table>\n<thead><tr><th>Component<\/th><th>Inspection<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>SHEV control panel<\/td><td>Function, fault display, mains and emergency power supply<\/td><\/tr>\n<tr><td>Batteries<\/td><td>Capacity and age; replacement as specified by the manufacturer<\/td><\/tr>\n<tr><td>Triggering devices<\/td><td>Trigger and check smoke detectors, SHEV push buttons and wind\/rain sensor<\/td><\/tr>\n<tr><td>Window drives<\/td><td>Opening time, full opening, current consumption, fastening and brackets<\/td><\/tr>\n<tr><td>Windows and fittings<\/td><td>Smooth running, seals, hinges, dirt and corrosion<\/td><\/tr>\n<tr><td>Cables<\/td><td>Cable routing, connections and circuit integrity<\/td><\/tr>\n<\/tbody>\n<\/table>\n<p>Finally, the entire system is triggered: all windows must open fully \u2013 for SHEV usually within 60 seconds \u2013 and then close properly again.<\/p>\n\n<h2>Typical defects in window actuators<\/h2>\n<ul>\n<li><strong>Actuator no longer opens fully:<\/strong> often a worn chain, a stiff sash or an actuator that is too weak after a window replacement.<\/li>\n<li><strong>Opening time too long:<\/strong> with long strokes, the running speed is not sufficient for the required opening.<\/li>\n<li><strong>Actuator hums but does not move:<\/strong> gearbox damage or overload.<\/li>\n<li><strong>Moisture and corrosion:<\/strong> especially on roof windows and rooflights with insufficient protection class.<\/li>\n<li><strong>Manufacturer no longer supplies:<\/strong> older actuators are sometimes no longer available.<\/li>\n<\/ul>\n\n<h2>Replacing a defective actuator<\/h2>\n<p>If a window actuator fails during maintenance, it must be replaced promptly \u2013 until then the SHEV system is not fully functional.<\/p>\n<p><strong>Important:<\/strong> Vent Systems actuators have no test certificate according to DIN EN 12101-2. Whether a replacement actuator may be used in an SHEV system is decided by the installer of the system for each project. With a tested NSHEV, window and actuator are tested as a unit \u2013 there, usually only the actuator approved by the manufacturer can be used.<\/p>\n<p>Replacements for brands such as GEZE, Aum\u00fcller, D+H, WindowMaster, HAUTAU and Kingspan STG in daily ventilation can be found in the guide <a href=\"\/en\/replacing-window-drives\/\">Replacing window drives<\/a> and in our replacement table. For daily ventilation we offer these actuators:<\/p>\n<table>\n<thead><tr><th>Application<\/th><th>Actuator<\/th><\/tr><\/thead>\n<tbody>\n<tr><td>Tilt and top-hung windows, facade<\/td><td><a href=\"\/en\/product\/vs-ka\/\">Chain actuator VS-KA<\/a> (24 V, 250\u20131500 N)<\/td><\/tr>\n<tr><td>Roof windows and skylights<\/td><td><a href=\"\/en\/product\/vs-la\/\">Linear actuator VS-LA<\/a> (600\u20135000 N)<\/td><\/tr>\n<tr><td>Heavy dome rooflights<\/td><td><a href=\"\/en\/product\/vs-sa\/\">Spindle actuator VS-SA 2500<\/a> or <a href=\"\/en\/product\/vs-ka-2500\/\">VS-KA 2500<\/a> (IP66)<\/td><\/tr>\n<\/tbody>\n<\/table>\n<p>Before every replacement, check the current draw, opening time, stroke and force of the new actuator. How RWA and <a href=\"\/en\/dictionary\/nrwg\/\">NRWG<\/a> are related is explained in the article <a href=\"\/en\/rwa-vs-nrwg-what-is-the-difference\/\">SHEV or NSHEV \u2013 the difference<\/a>.<\/p>\n\n<p><strong>Read more:<\/strong> <a href=\"\/en\/smoke-vent-stairwell\/\">Smoke Vent in the Stairwell: Requirements, Opening Size and Operation<\/a><\/p>\n<h2>Replace wear parts without being tied to the manufacturer<\/h2>\n<p>A faulty ventilation actuator does not have to come from the original manufacturer. If the replacement matches voltage, force, stroke and bracket, a maintenance company can swap it directly. Important: if the window belongs to a tested SHEV unit (NSHEV), the swap must be agreed with the manufacturer of the system. For maintenance companies we have a dedicated overview: <a href=\"\/en\/replacement-actuators-maintenance-companies\/\">Replacement actuators for maintenance companies<\/a>.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>Who is responsible for SHEV maintenance?<\/h3>\n<p>The building operator. They commission a qualified specialist company and ensure that maintenance and inspections are documented.<\/p>\n<h3>Is it enough to open the windows regularly for ventilation?<\/h3>\n<p>No. Daily ventilation replaces neither the maintenance of the control panel and batteries nor the trigger test of the entire system.<\/p>\n<h3>How long do SHEV batteries last?<\/h3>\n<p>That depends on the manufacturer, typically several years. The control panel manufacturer specifies when to replace them; maintenance checks capacity and age.<\/p>\n<h3>May I replace a SHEV actuator with another brand?<\/h3>\n<p>The installer of the system decides for each project. Technically, force, stroke, voltage, current draw and opening time must match. With tested NSHEVs, usually only the actuator approved by the manufacturer is permitted.<\/p>\n\n<h3>How often must a smoke ventilation system be serviced?<\/h3>\n<p>As a rule, once a year by a specialist company. This is required by DIN 18232-2 for natural smoke extraction systems and by the VdS guidelines. If the manufacturer specifies shorter intervals, these apply. In special buildings, recurring inspections by experts are added; they do not replace the annual maintenance.<\/p>\n<h2>Looking for a replacement actuator?<\/h2>\n<p>Send us a photo of the old actuator's type plate and of the window \u2013 we will name the right alternative, from stock in Hamburg. <a href=\"\/en\/contact\/\">To the contact form<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Which standards apply to smoke ventilation and what they mean for window actuators is explained in our overview <a href=\"\/en\/smoke-ventilation-standards-din-en-12101-2-din-18232\/\">Smoke ventilation standards: DIN EN 12101-2, DIN 18232 and building codes<\/a>.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">See also in the glossary: <a href=\"\/en\/dictionary\/window-actuator-maintenance\/\">Maintenance of window actuators<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Kurz gesagt: RWA-Anlagen m\u00fcssen mindestens einmal im Jahr von einer Fachfirma gewartet werden; die Ergebnisse geh\u00f6ren ins Betriebsbuch. Bei Sonderbauten kommt in vielen Bundesl\u00e4ndern eine wiederkehrende Pr\u00fcfung durch Pr\u00fcfsachverst\u00e4ndige hinzu. Verantwortlich ist der Betreiber des Geb\u00e4udes. Eine Rauch- und W\u00e4rmeabzugsanlage (RWA) muss im Brandfall sofort funktionieren \u2013 auch wenn sie jahrelang nur zum L\u00fcften oder [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":10829,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1959],"tags":[],"class_list":["post-15809","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-antriebstechnik"],"acf":[],"_links":{"self":[{"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/posts\/15809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/comments?post=15809"}],"version-history":[{"count":15,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/posts\/15809\/revisions"}],"predecessor-version":[{"id":18297,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/posts\/15809\/revisions\/18297"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/media\/10829"}],"wp:attachment":[{"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/media?parent=15809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/categories?post=15809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ventsystems.de\/en\/wp-json\/wp\/v2\/tags?post=15809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}